SCHEDULING - JME - SKIP TASK 

JOB FUNCTIONS Construction Manager, Site Supervisor
SUMMARY This test is to confirm users can skip tasks
PRE-CONDITIONS
  • The tester has login access to UAT.hyphensolutions.com/QUABuild/
  • The tester has the right user permissions set up
ASSUMPTIONS
  • The lot has been sent from NSE to BuildPro.
  • Purchase Orders have been successfully loaded.

 

TEST CASE STEPS:

  1. Log into  "BuildPro"
  2. Navigate to the schedule by clicking the JME menu button at the top of the screen. 
  3. Scroll through the task list to locate the task you wish to skip
  4. Check the Skip box. 
  5. Click the Update button at the top or bottom of the screen. 

EXPECTED RESULTS:

  1. Tester can skip a task

 

Below is the DATA seen while executing testing:

  1. Task Names - APPLIANCES INSTALL(ATION) (P), ELECTRIC -  HOT CHECK/PUNCH (M), GAS METER RELEASE/INSTALL (R)

NoteIf the pre-selected task does not exist in your assigned job, pick the next available task with the same type (P, M, or R) to complete the test.

Testers - Lot Assignment

Austin

  1. DC08165 - Patrick Durbin (CM)
  2. DC08173 - Aaron Jones (CM)
  3. PL00709 - Sergio Gutierrez (CM)
  4. PL00713 - Gerardo Gutierrez (CM)
  5. FD00324 - Gerardo Gutierrez (CM) - Box Scheduling
  6. 08177 - Amber Jones (BST)

Dallas

1. OD01213 - Eddie Dlugos - (CM)
2. RW01718 - Trae Rowland - (PM)
3. SR01717 - Andrew Bradley - (CM)
4. SR01825 - Steve Leach - (CM)
5. GD01823 - Sabrina Elixon (BP Admin)

7260 - 70018.20
7360 - 70107.10