SCHEDULING - JME - RESCHEDULE TASK
| JOB FUNCTIONS | Construction Manager, Site Supervisor |
| SUMMARY | This test is to confirm users can reschedule tasks |
| PRE-CONDITIONS |
|
| ASSUMPTIONS |
|
TEST CASE STEPS:
- Log into "BuildPro"
- Navigate to the schedule by clicking the JME menu button at the top of the screen.
- Scroll through the task list to identify the task for which you need to change the end date.
- Click the empty field under the “Resched Date” column to reveal a pop-up calendar.
- Select your desired new start date (The box will be highlighted in blue).
- Click the + sign next to the task name to pull up the notes field
- Type in the reason for the schedule change in the notes section
- Click the Update button at the top or bottom of the screen.
EXPECTED RESULTS:
- Tester can reschedule a task
Below is the DATA seen while executing testing:
- Task Names - GARAGE DOOR OPENER - INSTALL (P), AC START/HVAC - STARTUP (M)
- Reschedule start date (today +5), End date (06/01/2025)
Note: If the pre-selected task does not exist in your assigned job, pick the next available task with the same type (P, M, or R) to complete the test.
Testers - Lot Assignment
Austin
- DC08165 - Patrick Durbin (CM)
- DC08173 - Aaron Jones (CM)
- PL00709 - Sergio Gutierrez (CM)
- PL00713 - Gerardo Gutierrez (CM)
- FD00324 - Gerardo Gutierrez (CM) - Box Scheduling
- 08177 - Amber Jones (BST)
Dallas
1. OD01213 - Eddie Dlugos - (CM)
2. RW01718 - Trae Rowland - (PM)
3. SR01717 - Andrew Bradley - (CM)
4. SR01825 - Steve Leach - (CM)
5. GD01823 - Sabrina Elixon (BP Admin)
7260 - 70018.20
7360 - 70107.10